Home > News  >  Shredder production process details

NEWS

Shredder production process details

Time: 2019/2/20 9:17:47 Views:


In the production process of the shredder, the production efficiency of the equipment is highly correlated with the production volume and the time taken for production. In order to achieve a reasonable and stable breaking speed during the working of the shredder, it is necessary to determine The relationship between the production processes of the equipment, that is to say the need to determine the relationship between the feeding and discharging of the equipment and the time used, because the particle size of the material is uneven during the feeding, in the process of crushing, along with the material The difference in particle size will also be different in the crushing strength received, and the material with higher hardness will have a longer time to be crushed in the crushing chamber. This material is not broken until it meets the standard. Will be discharged outside the chamber, which will increase the workload of the shredder, the production will be affected, and the production efficiency and production speed will be affected. The relationship between the three is relatively close, and will Mutual influence, so we can increase the production efficiency of the equipment by increasing the production speed of the shredder. When the production speed is increased, the production efficiency will be substantially improved.


In order to increase the production speed of the shredder, it is necessary to increase the speed of the mixing between the various processes and the speed of the crushing work. This requires increasing the feeding speed of the feeder and reducing the no-load of the equipment due to the feeding of the feeder. Operation, to improve the crushing speed of the equipment, it is necessary to plan the particle size of the material. In the process of crushing the material with excessive particle size difference, the uneven force will prolong the time used for the crushing work of the equipment, and the work load of the equipment will also be caused. Therefore, the planned crushing can reduce the crushing speed of the shredder, and the discharging effect is ideal.


backToTop